Detached garage CMU walls in Elmhurst — engineered reinforcement, control joints at code spacing, and a structural block system built once and built right.
Project Details
Drag the handle to compare. Use arrows to browse all 3 project photos.
1/3 — Retaining wall — CMU block installed with vertical rebar and grout consolidation throughout
2/3 — Foundation section — CMU foundation wall built to code with full grouting and drainage
3/3 — Corner detail — reinforced block corners with proper control joint placement
This Elmhurst homeowner wanted a detached garage built as a permanent structure, not a budget shortcut. Our bid included the full engineered scope — rebar schedule, grout consolidation, control joint placement — and we executed it exactly as specified, delivering block walls that meet code and will outlast the vehicles they shelter.
Reinforcement schedules, grout consolidation, and control joint spacing are engineering requirements, not preferences
The finish masonry above is only as good as the structural block wall carrying it
On a builder’s schedule, structural masonry has to be right the first time — re-doing a block wall stalls every trade behind it
Every project follows the same disciplined sequence — no shortcuts, no hand-offs, same crew start to finish.
We assess soil bearing, drainage conditions, and code requirements before block selection. Retaining walls and foundation walls require engineering review — we do not skip this step.
We specify the correct CMU block type, rebar schedule, and control joint spacing for the load and soil conditions. Reinforcement is not optional for structural applications in Illinois.
Block is laid course by course with properly consolidated grout fill at all reinforced cells. Consolidation is inspected at each lift — improperly consolidated grout is the most common CMU failure point.
Control joints are placed at code-required spacing to manage movement. Waterproofing is applied to below-grade and retaining walls before backfill. All work is documented before we leave.
CMU block installation requires engineering knowledge that most contractors do not have: rebar schedules, control joint spacing, grout consolidation, and drainage detailing all affect long-term performance. AMS brings 19+ years of structural masonry experience to every CMU project.
CMU (Concrete Masonry Unit) block is a structural masonry unit used for foundation walls, retaining walls, garage walls, and load-bearing construction. It is stronger and more water-resistant than brick when properly installed with reinforcement and grouting.
For most structural applications in Illinois — retaining walls, foundation walls, load-bearing walls — yes, vertical rebar and horizontal joint reinforcement are required by code. We design reinforcement schedules for every structural CMU project.
A 100-linear-foot retaining wall typically takes 1-2 weeks. A full garage or addition foundation in CMU runs 2-3 weeks. We factor in curing time for grout consolidation before releasing the wall for loading.