CMU Block Installation

Engineered CMU Retaining Wall & Privacy Screen — Wilmette

Reinforced CMU retaining wall and privacy screen for a Wilmette residence — engineered rebar schedule, consolidated grout, and drainage designed for Illinois soil and frost conditions.

Village Center, Wilmette Cook County Completed 2025

Project Details

480 Sq Ft
1-2 weeks Duration
2025 Completed
5-year structural Warranty
Materials CMU block & mortar
Cost Range $8,000-$28,000
Location Village Center, Wilmette
County Cook County
Request a Free Estimate
Licensed & Insured Free Estimates Serving Chicagoland Since 2007 Mortar-Match Guarantee

CMU Is the Structural Backbone of the Build — Engineering Discipline Isn’t Optional

The owners of this Wilmette property wanted a retaining wall and privacy screen built once and built right — engineered, not improvised. We designed the reinforcement schedule to the soil conditions, consolidated grout at every reinforced cell, and detailed drainage so hydrostatic pressure never becomes this wall’s problem.

01

Reinforcement schedules, grout consolidation, and control joint spacing are engineering requirements, not preferences

02

The finish masonry above is only as good as the structural block wall carrying it

03

On a builder’s schedule, structural masonry has to be right the first time — re-doing a block wall stalls every trade behind it

Our CMU Block Installation Process

Every project follows the same disciplined sequence — no shortcuts, no hand-offs, same crew start to finish.

01

Foundation & Layout Assessment

We assess soil bearing, drainage conditions, and code requirements before block selection. Retaining walls and foundation walls require engineering review — we do not skip this step.

02

Block Selection & Reinforcement Planning

We specify the correct CMU block type, rebar schedule, and control joint spacing for the load and soil conditions. Reinforcement is not optional for structural applications in Illinois.

03

Block Laying, Grouting & Filling

Block is laid course by course with properly consolidated grout fill at all reinforced cells. Consolidation is inspected at each lift — improperly consolidated grout is the most common CMU failure point.

04

Control Joints, Waterproofing & Final Inspection

Control joints are placed at code-required spacing to manage movement. Waterproofing is applied to below-grade and retaining walls before backfill. All work is documented before we leave.

CMU Block Masonry Built to Structural Code That Performs Without Maintenance

CMU block installation requires engineering knowledge that most contractors do not have: rebar schedules, control joint spacing, grout consolidation, and drainage detailing all affect long-term performance. AMS brings 19+ years of structural masonry experience to every CMU project.

Mortar-Match Guarantee
Same Crew, Start to Finish
Written Estimate Before Work Begins
19+ Years of Local Expertise

Common Questions About This Project

Need CMU Block Installation Done Right?

See what AMS can do for your home — schedule your free on-site estimate and get a written quote within 48 hours.

Get Free Quote